[ Content | Sidebar ]


How to Design and Construct Roofs in Hygrothermal Zone

March 2nd, 2010

In order to design and construct roofs to be vented or unvented in any hygrothermal zone is the main idea of the roofing diy following document. It is a research report document related to the roof design that was written by Joseph Letiburek in 2004.

What you will find are sections such roof design in hot and cold climates, the main strategy utilized when designing roofs, Vented Roof Assembly, Unvented Roof Design and Assembly, the use of Rigid Insulation, Air Impermeable Spray Foam Insulation, and Unvented Flat Roof Assembly. All sections are described with clear explanations and illustration picture to help you understand.

How to Design and Construct Roofs in Hygrothermal Zone continued »

Bookmark and Share

Sponsored Links

Apexi Speed Meter Basic Connection – Vehicle Harness

March 1st, 2010

The following schematic shows how to perform basic connection diagram of vehicle harness for Apexi Speed Meter installation to the Engine Control Unit (ECU).apexi speed meter basic connection harness

1. Red wire – IG Power
2. Orange Wire – Constant Power
3. Yellow Wire – RPM Signal
4. Black Wire – Ground
5. Purple Wire – Vehicle Speed Signal Input

Apexi Speed Meter Basic Connection – Vehicle Harness continued »

Bookmark and Share

Sponsored Links



Incoming Search